{"id":29,"date":"2009-05-27T00:16:36","date_gmt":"2009-05-27T05:16:36","guid":{"rendered":"http:\/\/buildersnotebook.com\/blog\/?p=29"},"modified":"2023-06-22T18:29:10","modified_gmt":"2023-06-23T01:29:10","slug":"how-the-stimulus-package-impacts-construction-in-california","status":"publish","type":"post","link":"http:\/\/buildersnotebook.com\/blog\/index.php\/how-the-stimulus-package-impacts-construction-in-california\/","title":{"rendered":"How The Stimulus Package Impacts Construction In California"},"content":{"rendered":"\n<p>Each State has stimulus money allocated to them for different things, California&#8217;s share of the stimulus package is approximately $80 Billion. A good majority of this funding is allocated towards Health &amp; Welfare programs for our citizens. Within this allocation is maintenance like <a href=\"https:\/\/draindoctorga.com\/drain_repair.html\">drain repair<\/a>, upgrades, materials like metal, <a href=\"https:\/\/www.acmetals.com\/brass-copper\/\">brass<\/a>, and <span data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;third rail train equipment&quot;}\" data-sheets-userformat=\"{&quot;2&quot;:4226,&quot;4&quot;:{&quot;1&quot;:2,&quot;2&quot;:11982760},&quot;10&quot;:2,&quot;15&quot;:&quot;Arial&quot;}\"><a href=\"https:\/\/www.manceassociates.com\/contract-manufacturing\">third rail train equipment<\/a>, as well as<\/span>&nbsp;new construction of streets, wastewater treatment projects, and buildings.<\/p>\n\n\n\n<p>All grants are being funded by the Federal Government, and the money is given to the State (Departments thereof) in which other agencies must apply for funding through the grant process. The following are approximate values of construction related work for the period of 2008-2010 for the State of California.<\/p>\n\n\n\n<p>School Improvements $1.5M<br>\nTax Credit Bonds for School Improvements $2.24M<br>\nCALTRANS Project, Airport Improvements, AMTRAK $4 Billion<br>\nConstruction of Research Buildings $18M<br>\nUniversity Improvements $130M<br>\nDept of Public Health Construction (partial) $200M<br>\nPublic Housing Repair (HUD) $131.2M<br>\nBlock Grants $123.3M<br>\nHUD Tax Credits to Rehab Low Income Housing using Green Technologies $325.9M<br>\nWatershed Improvements $34M<br>\nRural Wastewater Treatment Facilities $138M<br>\nWastewater Treatment Systems $284.6M<br>\nUnderground Storage Tank $18M<br>\nHAZ Waste Cleanup $10M<br>\nCapital Improvements &amp; Maintenance $14.7M<\/p>\n\n\n\n<p>In addition, the following are Federally funded projects that plan to take place between 2008-2010 in San Luis Obispo, Santa Barbara, and Ventura Counties (this information was obtained through a 3rd party). This is a list of Federal grants (mostly Military) that have been fully funded and are either in the planning stage or published;<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 06\u20101191E Study \u2010Validate Short Circuit Analysis<br>\nLOMPOC (Vandenberg AFB)<br>\n$500,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 04\u20101146B Maintain Slopes, Lower Honda Ridge Road<br>\nLOMPOC (Vandenberg AFB)<br>\n$5,000,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 03\u20101031A Repair Parking Lot at Entry VEH FAC, Bldg 8415<br>\nLOMPOC (Vandenberg AFB)<br>\n$5,000,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 09\u20101082B Repair Runway Shoulders<br>\nLOMPOC (Vandenberg AFB)<br>\n$1,000,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 06\u20101155B1 Repair 30 MSG HQ Overflow Parking Lot<br>\nLOMPOC (Vandenberg AFB)<br>\n$1,000,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 05\u20101091B Repair 13Th Street from Iceland Ave to California Blvd<br>\nLOMPOC (Vandenberg AFB)<br>\n$1,000,000<\/p>\n\n\n\n<p>RECOVERY XUMU 07\u20101262B, Repair and Exercise Water Valves Basewide<br>\nLOMPOC (Vandenberg AFB)<br>\n$1,000,000<\/p>\n\n\n\n<p>RECOVERY XUMU 06\u20101136B, Renovate Training Facility at CE Horizontal Shop, Bldg 10719<br>\nLOMPOC (Vandenberg AFB)<br>\n$500,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 10\u20101070C Construct Parking Lot Extension for Bldg 8314<br>\nLOMPOC (Vandenberg AFB)<br>\n$500,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 02\u20101010A Repair 35Th Street<br>\nLOMPOC (Vandenberg AFB)<br>\n$500,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 11\u20101004A Repair North Edge of Road West of Bldg 441<br>\nLOMPOC (Vandenberg AFB)<br>\n$500,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 99\u20101022B9 Repair 8Th Street<br>\nLOMPOC (Vandenberg AFB)<br>\n$500,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 07\u20101067B Repair Roof at Delta IV Solid Rocket Motor Facility<br>\nLOMPOC (Vandenberg AFB)<br>\n$500,000<\/p>\n\n\n\n<p>RECOVERY XUMU 09\u20101138B, Repair Chillers for Electronics Lab at Missile Maint Fac<br>\nLOMPOC (Vandenberg AFB)<br>\n$500,000<\/p>\n\n\n\n<p>RECOVERY XUMU 08\u20101157B, Replace Hvac Unit, BCE Maint Shop<br>\nLOMPOC (Vandenberg AFB)<br>\n$250,000<\/p>\n\n\n\n<p>RECOVERY XUMU 13\u20101022B, Replace Kitchen Floor, BLDG 13330<br>\nLOMPOC (Vandenberg AFB)<br>\n$250,000<\/p>\n\n\n\n<p>RECOVERY XUMU 95\u20101314B, Repair COMM GATR Facility<br>\nLOMPOC (Vandenberg AFB)<br>\n$250,000<\/p>\n\n\n\n<p>RECOVERY XUMU 09\u20101119B, Replace Chiller 1 at Admin Bldg 8500<br>\nLOMPOC (Vandenberg AFB)<br>\n$250,000<\/p>\n\n\n\n<p>RECOVERY XUMU 09\u20101090B, Repair Missile\/space Research Lab, Bldg 7408<br>\nLOMPOC (Vandenberg AFB)<br>\n$250,000<\/p>\n\n\n\n<p>RECOVERY XUMU 09\u20101286C, Install Communications Room A\/C, Bldg 8401<br>\nLOMPOC (Vandenberg AFB)<br>\n$250,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 08\u20101439B Replace Roof at Cocess, Bldg 11152<br>\nLOMPOC (Vandenberg AFB)<br>\n$250,000<\/p>\n\n\n\n<p>RECOVERY XUMU 95\u20101041C, Construct Storage at Fire Station #1<br>\nLOMPOC (Vandenberg AFB)<br>\n$250,000<\/p>\n\n\n\n<p>RECOVERY XUMU 07\u20101124B, Replace Taxiway Lights at South Alpha Taxiway<br>\nLOMPOC (Vandenberg AFB)<br>\n$100,000<\/p>\n\n\n\n<p>RECOVERY XUMU 11\u20101031C, Install Ceiling Fans, BLDG 13135<br>\nLOMPOC (Vandenberg AFB)<br>\n$100,000<\/p>\n\n\n\n<p>RECOVERY XUMU 09\u20101176B, Repair Ladies Restroom, Bldg 9320<br>\nLOMPOC (Vandenberg AFB)<br>\n$100,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 04\u20101146B Maintain Slopes, Lower Honda Ridge Road<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 06\u20101155B1 Repair 30 MSG HQ Overflow Parking Lot<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 11\u20101004A REpair North Edge of Road West of Bldg 441<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 09\u20101375A Basewide Facility Painting Contract Plus \u2010Up<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 07\u20101067B Repair Roof at Delta IV Solid Rocket Motor Facility<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 10\u20101070C Construct Parking Lot Extension for Bldg 8314<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU101090A Replace Electrical Switchgear at Ct\u20103<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU061008B1 Upgrade Feeder Cable, South\u2010v Power Plant<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU091285C Repair\/Replace Uninterruptable Power Supply, Bldg 8401<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU091128B2\u20101 Rental of Trackhoe Equip (Without Operator)<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU091128B2\u20103 San Antonio Creek Restoration for Corrugated Pipe, Silt Fence and Sandbags<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY XUMU 06\u20101189B, Replace Hvac Units &amp; Controls at AAFES BX<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 06\u20101023B Repair California Blvd, Hwy 1 to Utah Ave<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 09\u20101375A Basewide Facility Painting Contract Plus \u2010Up<br>\nLOMPOC (Vandenberg AFB)<br>\n$1,000,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU 08\u20101025B Repair Roof at EELV FAB Shop, Bldg 8305<br>\nLOMPOC (Vandenberg AFB)<br>\n$1,000,000<\/p>\n\n\n\n<p>RECOVERY XUMU 08\u20101459B, Repair Crac Units in Admin Bldg 7025<br>\nLOMPOC (Vandenberg AFB)<br>\n$1,000,000<\/p>\n\n\n\n<p>RECOVERY XUMU 07\u20101235B, Renovate Mens and Womens Restrooms, Bldg 6523<br>\nLOMPOC (Vandenberg AFB)<br>\n$250,000<\/p>\n\n\n\n<p>RECOVERY XUMU 11\u20101061B, REPAIR FITNESS CENTER, BLDG 9005<br>\nLOMPOC (Vandenberg AFB)<br>\n$250,000<\/p>\n\n\n\n<p>RECOVERY XUMU 13\u20101025C, Construct 70 Storage Cages for the Dormitory, Bldg 13135<br>\nLOMPOC (Vandenberg AFB)<br>\n$100,000<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU091213B1 Repair Range Facilities Launch Operations Support Center Repair Backlog Plus up<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMX071298D \u2010 Corrosion Control Antenna Farm<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>RECOVERY \u2010 XUMU091128B2\u20102 San Antonio Creek Restoration: Rental of Padfoot ride\u2010on roller compactor and Water Truck<br>\nLOMPOC<br>\n(no value stated)<\/p>\n\n\n\n<p>Radiological Assessments<br>\nVENTURA<br>\n$54,000,000<\/p>\n\n\n\n<p>Recovery Act Task Order Presolicitation Notice<br>\nPORT HUENEME<br>\n(no value stated)<\/p>\n\n\n\n<p>Western Rail Infrastructure Security<br>\nCALIFORNIA<br>\n$12,870,000<\/p>\n\n\n\n<p>Relaunch Amtrak.com and supporting systems<br>\nCALIFORNIA<\/p>\n\n\n\n<p>IT\/Telecommunications: Procurement Sourcing and Contracts System (ARIBA)<br>\nCALIFORNIA<\/p>\n\n\n\n<p>RECOVERY Santa Maria River Levee<br>\nSANTA MARIA<br>\n$47,000,000<\/p>\n\n\n\n<p>Rehabilitate Apron [East &amp; Central Apron<br>\nCAMARILLO<br>\n$1,500,000<\/p>\n\n\n\n<p>In Ventura County in and Near Camarillo, from Daily Drive to Route 118<br>\n$1,628,370<\/p>\n\n\n\n<p>RECOVERY XUMU 07\u20101124B, REPLACE TAXIWAY LIGHTS AT SOUTH<br>\nALPHA TAXIWAY<br>\nVANDENBURG AFB<\/p>\n\n\n\n<p>West Division \u2010 Facility Upgrades<br>\nSANTA BARBARA COUNTY<\/p>\n\n\n\n<p>Click <a href=\"http:\/\/www.recovery.ca.gov\/Spending_Chart\/Health.asp\">here<\/a> to obtain more information about the State of California budget for the Stimulus Package.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Each State has stimulus money allocated to them for different things, California&#8217;s share of the stimulus package is approximately $80 Billion. A good majority of this funding is allocated towards Health &amp; Welfare programs for our citizens. Within this allocation is maintenance like drain repair, upgrades, materials like metal, brass, and third rail train equipment, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[33,3,27],"tags":[39,11,45,12,245,24,43,48,42,49,47,29,41,44,40,50,46],"_links":{"self":[{"href":"http:\/\/buildersnotebook.com\/blog\/index.php\/wp-json\/wp\/v2\/posts\/29"}],"collection":[{"href":"http:\/\/buildersnotebook.com\/blog\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/buildersnotebook.com\/blog\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/buildersnotebook.com\/blog\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/buildersnotebook.com\/blog\/index.php\/wp-json\/wp\/v2\/comments?post=29"}],"version-history":[{"count":17,"href":"http:\/\/buildersnotebook.com\/blog\/index.php\/wp-json\/wp\/v2\/posts\/29\/revisions"}],"predecessor-version":[{"id":797,"href":"http:\/\/buildersnotebook.com\/blog\/index.php\/wp-json\/wp\/v2\/posts\/29\/revisions\/797"}],"wp:attachment":[{"href":"http:\/\/buildersnotebook.com\/blog\/index.php\/wp-json\/wp\/v2\/media?parent=29"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/buildersnotebook.com\/blog\/index.php\/wp-json\/wp\/v2\/categories?post=29"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/buildersnotebook.com\/blog\/index.php\/wp-json\/wp\/v2\/tags?post=29"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}